Non-Conformance Report


Non Conformance Report :
Non conformance is an instance when a product does not meet product specifications — irrespective of  nonconformity is major or minor.
It is the policy that processes , activities, products which do not conform to plans and specifications shall be identified, documented and dis-positioned in a formal and consistent manner.
Construction field shouldn't conflict with--
Quality Action Notice /Corrective Action Request :
The essence of CAR is to conduct investigation on a problem which already happened and needs root cause analysis and resolution to prevent recurrence.

NCR subjected to as follows--

Closure of Non Conformance report

Re-inspection and work check according to disposition
 If acceptable then sign ,date and close
Unacceptable : “Engineering concurrence”  stated-- only after ensuring that adequate measures have been taken to prevent inadvertent use of the unacceptable item.
Work shall be re performed


Comments

Popular posts from this blog

Reinforcements for concrete structures

Concrete works